DETAIL STUDY AND SUPERVISION STUDY OF MELAH DAM WORKS AND TRANSFER WORKS
Client : General Directorate of Dams and Major Hydraulic Works (Tunisia)
Date : 2011 - 2016
Funding : FADES
Partner : ARTELIA/ISL
Project description
The Maleh dam is an earth dam with a compacted earth dyke 49 m high and a total backfill volume of 3,000,000 m3, equipped with a bottom drainage and diversion structure and a free threshold spillway.
The transfer structures consist of a forced gravity pipe in concrete wrapped in DN1400 over 7 km and DN800 over 10 km.
Description of the services provided
- Establishment of execution plans for dam structures (water intake tower and footbridge, scuppers, various structures (restitution, spillway), diversion gallery and tunnel), and transfer structures (pumping stations, civil engineering works).
- Supervision of dams and transfer structures
- Animation of a costs and deadlines unit
Technical and financial assistance and expertise