S E R A H

Loading

DETAIL STUDY AND SUPERVISION STUDY OF MELAH DAM WORKS AND TRANSFER WORKS

Client : General Directorate of Dams and Major Hydraulic Works (Tunisia)

Date : 2011 - 2016

Financement : FADES

Project description

The Maleh dam is an earth dam with a compacted earth dyke 49 m high and a total backfill volume of 3,000,000 m3, equipped with a bottom drainage and diversion structure and a free threshold spillway.

The transfer structures consist of a forced gravity pipe in concrete wrapped in DN1400 over 7 km and DN800 over 10 km.

Description of the services provided

  • Establishment of execution plans for dam structures (water intake tower and footbridge, scuppers, various structures (restitution, spillway), diversion gallery and tunnel), and transfer structures (pumping stations, civil engineering works).
  • Supervision of dams and transfer structures
  • Animation of a costs and deadlines unit

Technical and financial assistance and expertise

Back