EDDIR DAM DETAIL STUDY
Client : General Directorate of Dams and Major Hydraulic Works (Tunisia)
Date : 2013 - 2018
Project description
The Eddir dam is located in the northeast of Tunisia. The main objectives of this development are:
- Regulation for the operation and management of the Eddir wadi basin
- The creation of new irrigated perimeters
The main characteristics of the dam are as follows:
- Useful capacity of the reservoir: 11.25 hm3
- Height of the dam: 45 m
- Crest length: 510 m
The spillway consists of a lateral earthen spillway. The water intake consists of a 49 m high intake tower; a concrete gallery with a DN 1800m section provides the bottom drainage.
Description of the services provided
- Preparation and monitoring of geological and geotechnical reconnaissance campaigns
- Revision and development of the APS
- Development of the detailed preliminary design
- Establishment of works execution plans
Technical files and procurement of works