EDDIR DAM DETAIL STUDY

Client : General Directorate of Dams and Major Hydraulic Works (Tunisia)

Date : 2013 - 2018

Project description

The Eddir dam is located in the northeast of Tunisia. The main objectives of this development are:

  • Regulation for the operation and management of the Eddir wadi basin
  • The creation of new irrigated perimeters

The main characteristics of the dam are as follows:

  • Useful capacity of the reservoir: 11.25 hm3
  • Height of the dam: 45 m
  • Crest length: 510 m

The spillway consists of a lateral earthen spillway. The water intake consists of a 49 m high intake tower; a concrete gallery with a DN 1800m section provides the bottom drainage.

Description of the services provided

  • Preparation and monitoring of geological and geotechnical reconnaissance campaigns
  • Revision and development of the APS
  • Development of the detailed preliminary design
  • Establishment of works execution plans

Technical files and procurement of works