MORNAGUIA WASTE WATER STATION - ASSISTANCE IN THE CONTROL OF EXECUTION WORKS, RECEPTION AND COMMISSIONING

Client : National Sanitation Agency (ONAS)

Date : 2014 - 2016

Funding : KFW

Description

The project concerns the construction work of the Mornaguia treatment plant, the design data of which are:

- Flow: 6060 m3 / d,

- Load: 2 602 kg BOD5

- Process: Activated sludge at low load with mechanical dewatering of the sludge

  including tertiary treatment (filtration and UV disinfection)

Services provided

Civil Engineering

  • Assistance with site start-up operations:
  • Assistance during construction:

Electromechanical

  • Verification and approval of the site inspection and testing program prepared by the contractor,

Water and sludge treatment :

  • Assistance and supervision of the water supply to the WWTP
  • Definition and monitoring of the station performance test protocol,