ETUDE DU SYSTEME DE TRANSFERT DES EAUX USEES DE LA STATION D’EPURATION DE COTIERE NORD VERS LA STATION DE CHOUTRANA (GD TUNIS)
Client : National Sanitation Agency - ONAS
Date : 2009 - 2012
Funding : Wordl Bank
Project Description:
The study focused on the following aspects:
- Verification of the design flow rate of the transfer system and its updating taking into account the prospects for urban development in the northern region of the city of Tunis
- The design of the transfer system: choice of the diameter and nature of the discharge pipes (2*DN710 over 9.4 km) and the pumping station (Q = 1.3 m3/s, HMT = 40 m )
- Investment estimate
- Establishment of work tender documents
Services provided ::
- Project design :
- Establishment of basic data
- Technical study of the transfer system
- Sizing of networks and works
- Comparative studies of choice
- Tendering Document
- Detailed technical specifications
- Establishment of works detailed plans