| العنوان |
السنة |
|
| Flood protection scheme – Cities of Bouhjar, Menzel Nour, Lamta and Sfax-west |
2011 |
|
| Study for sanitation network restructuring - Fouchana and M'hamdia areas |
2011 |
|
| Sewage system master plan – cities of Maâmoura, Somaâ, Tazarka |
2010 |
|
| GP 9 road irrigation project with treated wastewater |
2010 |
|
| Industrial zone of Ben Arous – Hydraulic and drainage study |
2010 |
|
| Design and Final Design study of Eddir Dam (with Sogreah) |
2009 |
|
| Final Design study of Douimis and Maleh dams and supervision of works (with Sogreah) |
2009 |
|
| Audit of irrigation system – irrigated perimeters in Jendouba governorate |
2009 |
|
| Flood protection study – Bifecta plant |
2008 |
|
| Flood protection study – Delice Danone plant in Slimane |
2008 |
|
| Irrigation development perimeters from hill dams of Zangou, Fjij, Nfidha |
2008 |
|
| Rehabilitation of drinking water system study (lot 1 Kef Ezzahi et Rmadhnia Rouisset) |
2007 |
|
| Study for replenishment of irrigation system – Flamingo golf Monastir (70 ha) |
2006 |
|
| Rehabilitation study of hydraulic infrastructures and pumping stations of the public irrigated perimeters of Jendouba |
2006 |
|
| Rehabilitation study of Borj Touil perimeter (3000 ha) irrigated with wastewater treated water |
2005 |
|
| Rehabilitation study of Mornag perimeter (2000 ha) irrigated with wastewater treated water |
2005 |
|
| Final design and supervision of work, Kébir and Moula dams and water transfers |
2004 |
|
| Water ressources protection of irrigated perimeter of Chenchou |
2004 |
|
| Reference situation assesment in the framework of PDAI de Gabès |
2004 |
|
| Sejnane irrigated perimeter (5000 ha), study and supervision of works |
2004 |
|
| Hydro-agriculture development in Nefza plain (3700 ha) – study and works supervision |
2003 |
|
| Study for the creation of several irrigated perimeters - Sidi Zid2, Ben Saïdane 2, Douar Haj Amor, Oued Touil and Jebel Zaghouan |
2003 |
|
| Study for the creation of six irrigated perimeters in governorate of Kairouan |
2003 |
|
| Supervision of works and assistance to owner in the framework of Mekna Tabarka plain irrigation project upon Zarga dam |
2003 |
|
| Technical and social study of five hill dams projects in Governorate of Kasserine |
2002 |
|
| Badrouna pumping station rehabilitation project and Sidi Ismail perimeter enhancement project, Governorate of Jendouba |
2002 |
|
| Science city in Tunis - Engineering work |
2001 |
 |
| Study for the creation of several irrigated perimeters : Aïn Battoum, Ouled El Ifa, Zbidine and Oued El Ghirane (300 ha) |
2001 |
|
| Project development in the watershed area upon Oued Mellegue, Water ressources management |
2001 |
|
| Henchir Jefna peimeter (450 ha) rehabilitation project |
2001 |
|
| Technical and social study of five hillside dams project – Governorate of Kasserine |
2001 |
|